The Hulimavu and IIM-B junction updates are part of a major 2026 plan to end traffic jams on Bannerghatta Road. By widening the road to 160 feet and building new grade separators, the city has cut travel time to the city center by 20 minutes. These junction fixes work with the new Pink Line Metro to create a signal-free flow. For residents of Godrej Vanantara, these upgrades mean a smooth, fast drive to Jayanagar and Dairy Circle.
The Bengaluru South City Corporation (BSCC) has prioritized these two junctions to clear the "bottlenecks" that once delayed thousands of commuters.
| Junction Name | Current Status (April 2026) | New Infrastructure | Time Saved |
|---|---|---|---|
| IIM-B Junction | Operational | Integrated Metro-Flyover | 12 Mins |
| Hulimavu Junction | Finishing Stages | Wider 6-Lane Carriageway | 10 Mins |
| Vega City Junction | Operational | Multi-Level Grade Separator | 15 Mins |
| Gottigere Junction | Operational | Signal-Free U-Turns | 8 Mins |
A key update in 2026 is the integrated flyover near the IIM-B campus. This structure allows vehicles to move on a dedicated level above the local traffic signals.
At the Hulimavu Junction, the road width has increased significantly. The removal of old structures has allowed for a clean, six-lane stretch.
Godrej Vanantara is a premium 36-acre forest-themed township located just minutes from these upgraded junctions. With the road widening and new flyovers, residents enjoy a stress-free commute to the city's business districts. The project features 18 high-rise towers and a massive 70,000 sq. ft. clubhouse, blending urban connectivity with a peaceful forest life. Explore the luxury lifestyle and forest-themed amenities at Godrej Vanantara.
Yes, as of early 2026, the flyover sections are open, greatly reducing the wait time at the IIM-B gate.
The road has been widened to 160 feet (45 meters) to accommodate six lanes of traffic and service roads.
Yes. It clears the major bottlenecks between the city and the project, making the drive much smoother.
Yes, additional grade separators at key junctions like Vega City and JP Nagar 4th Phase are also part of the 2026 upgrades.
Commuters report saving between 20 to 30 minutes during peak office hours thanks to these infrastructure fixes.